![]() ![]() The FACP/burg panel must be configured to supervise the phone lines. Both Phone line 1 and 2 must be connected to the FACP/burg panel.Burglary installs must have cover tamper enabled and must be tested yearly. After installing BAT-Fire, or modifying any FACP/īurg panel programming, verify proper operation and reporting of all event codes using your FACP/burg panel installation manual.Confirm POWER, TROUBLE, and COMM LEDS are green. ![]() Program the BAT-Fire via AlulaConnect (see Programming section).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |